C272 It Really Was Almost over
21th, Dec., 7497, Rainbow Cake Tower's 14th floor's joint charging system completed.
With the main source of magic power that had been put into operation long ago, the part of the Mage Tower that was related to reinforcing the structure of the Plane was almost complete.
Ten days later, on the last day of 7497, Riko carried out her first test run