Metal Storm: Invasion war/C389 Repair Work
+ Add to Library
Metal Storm: Invasion war/C389 Repair Work
+ Add to Library

C389 Repair Work

Every underground city had considered the possibility of a beast invading the city when it was first constructed.

Therefore, when the underground city was being constructed, special tunnels were planned to allow the mechs to pass through.

The roads and buildings on both sides of the tunnels had been reinforced and had been designed to withstand earthquakes.

Even if the mechs ran at full speed

Continue to read this story on the app
Setting
Background
Font
18
Nunito
Merriweather
Libre Baskerville
Gentium Book Basic
Roboto
Rubik
Nunito
Page with
1000
Line-Height
Please go to the Novel Dragon App to use this function