C78 Cargo Hold
A lift platform was slowly lowered down by the crane. It was 15 meters in height and after almost a minute, the elevator platform fell into the water with a "puchi".
Although it was called an elevator, it was just a description. In fact, it was a rectangular platform with huge iron chains attached to the four corners, a crane and an elevator connected to the platform