C560 He Had a Plan
This year, the number of jade pieces was shorter than the previous years, only six days. In the past, it was ten days, so the workload was even greater. All of the hidden pieces had to be completed in batches within two days, and the second day would be the opening of the bidding.
The last day was the open bidding